Schedule 40 PVC (gray electrical conduit) will work just fine. A ten foot length should cost no more than $2 a length so buy several. The do break from time to time.
Use the flared end to hold the weight places in place.
User Tag List
Results 1 to 10 of 93
Thread: So you want to be an athlete?Threaded View
|
Bookmarks