OK, so we had a snow day today! Perfect time to finish this kilt so I can wear it tonight to the first meeting of my anatomy class.

Apron edge fringed and sewn down. Waist band pinned in place.


First edge of the waist band stitched down...ready for the next line of stitching. Finally getting that ugly canvas job covered up!


Have I mentioned that I had never sewn more than a button or patch before Alan H and the X-Kilt manual came out? After several X-kilts came some X-kilt variants of my own design, and then I got TAOK and tackled a full-on tank. This MacDonald will be the 8th wool kilt I've made. It still takes 30+ hours!