I could tell you it was machine sewn...but I would be lying. As mentioned, I've tons of sewing experience, which made it much simpler no doubt.

A nice touch, I think, is my hangar loops. They're made from Nomex. Figure if the whole thing goes up in flames, I'd at least have something left over.

Grand total will be in the 20-21 hour range. I'm still PO'd about the tartan though. :-x As for pics, I'll have to find someone with a digital. And, being out in the sticks, that could be some time.