It seems we got slid into a gap in the production schedule. (ain't it great to deal with a fellow X Marker?)

For the amount of fabric we have ordered it will take two days to actually weave the fabric. Then it is inspected inch-by-inch. After that it goes out to be washed and finished. That will take about two weeks.
Gordon should have it back at the mill a couple of days after that and then he will ship it to me or I will get on the ferry and pick it up.
I then will need to cut each members required length, box it up with address labels and customs forms. As each box is packed I will make a run to the post office and send them on their way to you all.

Say about six or seven more months, tops.